ETAP tools > Intelligent Load Shedding

ETAP ILS Logo

Intelligent Load Shedding (ILS) provides optimal, fast load shedding for electrical disturbances and loss of generation. ILS calculates the minimum required MW to be shed for each subsystem according to the type and location of the disturbance, actual operating generation, spin reserve, loading, configuration, load distribution, and priority. ILS then selects the best combination of loads (CBs) that will satisfy this requirement. All of this is executed in less than 100 ms after a disturbance occurs in the system.

ILS workflow diagram
  • Response to mechanical & electrical disturbances
  • Display required minimum MW & selected loads
  • Trigger & time dependent load shedding
  • User-definable control logics & macros
  • Neural network knowledge base
  • User-definable system triggers
  • Operator friendly interface
  • Display operating & recommended spin reserve MW
  • Display monitored data on the one-line diagram or MMI objects
  • Log & view ILS recommended load shedding
  • Log & view system load shedding actions
  • Unlimited load shedding schedules
  • User-defined load priority & groups
  • Option to simulate & test ILS recommendations

Benefits
ETAP's unique combination of optimization and simulation provide a powerful new set of management tools for a more effective power system operation.

  • Eliminate unnecessary load shedding
  • Reduction of downtime for critical loads
  • Reduction of spinning reserve requirements
  • Reliable load preservation system
  • Fast response to electrical & mechanical disturbances
  • Robust calculation method
  • Operator alerts for marginal operating conditions

Shed Less Load with ILS
The longer that it takes to shed load during a disturbance, the more load that must ultimately be shed. Because of the intelligence and speed of ILS, the actual amount of load that is shed is far less than that of using the conventional methods such as frequency relay and PLC-based schemes.

Comparison of load shedding with ILS
With PLCs...

Unlimited Load Schedules
EMS is utilized for power system planning, design, and operation optimization. Demand-Side Management (DSM) produces a more reliable and economical operation, while maintaining the power systems operational integrity. EMS state-of-the-art load management application provides intelligent load flow solutions to minimize operating costs and maximize system performance. EMS allows you to maximize the value of your energy investment.

* For a full list of ETAP modules specific for your needs, feel free to refer to the company's product and modules page
* To request a brochure or a demo CD for these tools, please fill in this form and we will respond to your request personally.
 
 
 